Don’t Raid the Cookie Jar Capital Budgeting is Essential

Don’t Raid the Cookie Jar

Sometimes the future seems like it’s an awfully long way away. If a roof is going to last 30 years, why should we worry about it today? Same with that shiny new boiler, HVAC chiller or that flat, crack-free pavement just poured two summers ago. Eventually, though, everything new grows old. Wear and tear sets in and soon, those elements we thought would last forever are in need of repair or replacement.

That is where a reserve study comes in handy—very handy, in fact, because it means your co-op or condo community has been socking away savings for years in order to pay for those big replacements and repairs.

A Changing Landscape

Handy as they are, reserve studies have not always been as common, or as necessary, as they are today. That changed dramatically when the number of mortgages backed by Fannie Mae, Freddie Mac and the Federal Housing Administration (FHA) began to grow. “Five or six years ago, they only represented five percent of mortgages,” says Mitch Frumkin, PE, RS, CGP, president and founder of Kipcon, a full service engineering firm headquartered in North Brunswick. “Today, 75 percent of condo mortgages are guaranteed by FHA, Fannie Mae and Freddie Mac.”

This tilted the scale in favor of reserve studies because “they have regulations for insuring mortgages and in order for it to be guaranteed, there are certain requirements that have to be met,” Frumkin says. One of those requirements is that ten percent of the budget must be set aside on an annual basis for future repairs, or the board must do a reserve study that shows they can afford to put aside less.

“In a high rise, you can have a $7 million budget, and ten percent of that is $700,000” so that is what must be set aside each year, says Frumkin. If a reserve study is done, though, analyzing exactly what replacements and repairs must be made in the years to come and how much needs to be saved to pay for them, the number will likely be significantly less. “You can pay $15,000 for a reserve study and save hundreds of thousands of dollars,” Frumkin says.

A capital needs assessment is more short-term. “It says ‘In the next five years, these will be your capital needs,’” Frumkin explains. They may need a roof replaced at the end of those five years, but it does not involve making long-term budget plans the way a reserve study does. With a reserve study, if a roof costs $100,000 to replace, the building will have been putting aside $5,000 a year for the last 20 years to pay for it. A capital needs assessment is “not a good financial tool to establish a funding plan,” says Frumkin.

How Does it Work?

Reserve studies are usually performed by engineers or architects who have earned specialized designations known as Reserve Specialists (RS). These specialists examine the condition of the common elements such as the building’s exterior including the roof, façade, sidewalk, roadways, storm water drainage and more. After evaluating the building or association, the reserve expert will prepare a report including a 30-year expenditure page that shows prospective costs for each year. On average, it takes about 60 days to have a reserve study performed. Studies can be updated every three to five years.

In order to estimate the cost and time-line factors for the study, the expert looks at the typical standards for the expected life of an element—pavement, for example, may typically last 20 years. The engineer will then assess the age and relative condition of that particular section of pavement—whether it's cracked or otherwise showing signs of deterioration—and make a determination based on the condition of the element versus how many useful years of life are expected from it.

The studies are updated on a regular basis. “In a new association or community, you can do updates every three to five years,” says one reserve specialist. “As the community ages, you need to update them more frequently to ensure accuracy in pricing and to know that you’ll have the money there when you need it.”

In order to best accommodate the individual needs of each building evaluated, the pros say that a firm conducting the reserve study “will try to phase the projects over a couple of years.” Still, though, some buildings may find themselves underfunded, which means they may need to turn to an assessment—never a popular action—or alternative methods of financing, such as a bank loan.

Don’t Neglect the Maintenance

The longevity of any building system depends upon many factors including the type of system, be it the roof or the windows or the elevators or the plumbing, how often it is used, how old it is, how well it’s been cared for, and even the effects of inclement weather. It’s axiomatic that the best-run buildings will have every pump on every system labeled, and a record kept of each servicing and replacement of every part on each piece of equipment or building system.

Generally speaking, hot water heaters in multi-family buildings will last for a decade or so. The life spans of HVAC components vary depending upon the type of system, but usually they will last for 15 to 30 years. Trash compactors have a shorter life span than, say, a boiler, and often last for only 8 to 10 years. Major plumbing components can last 50 to 60 years, but when they are close to the end of their usable life, management should account for the fact that the equipment will need to be replaced soon. Elevators typically last for 30 to 40 years, with proper maintenance.

And don’t neglect the roof. Roofing is one the most carefully inspected part of a building in reserve studies. Obviously, it’s a very important part of a structure, but a poorly-maintained roof can lead to all sorts of horrible, costly issues.

“No matter what material we’re looking at, it’s one of those 20-year time frames. They have 30-year shingles, 25-year shingles, but we’re always kind of looking to 20 to 25 years” in reserve studies, says Daniel Iles, a senior associate at Massachusetts-based On-Site Insight, an engineering consulting firm that does reserve study analysis and which serves most of New Jersey.

Paying Wisely

Planning is everything when it comes to the successful maintenance and upkeep of a co-op or a condo building. The number one mistake people make in these situations “is that they don’t do reserve studies,” says Frumkin. “Even if you don’t set aside the money, you’ll still need to replace the element. It’s not going to wait for you to get the money. Managers and attorneys have a responsibility to understand this and communicate it so they aren’t faced with an assessment.”

Reserve funds also benefit from planning for those parts of a repair project that are unforeseen, says Jeffrey Roude, a partner with the accounting firm of SaxBST with offices in New York and New Jersey. Problems can arise “when you don’t put in contingency for a project,” he says. “There’s always some unforeseen additional repair.” He gives the example of a boiler replacement that also then requires some new piping. It is beneficial to add 15 to 20 percent to these budgets just to cover those unexpected costs.

For those buildings that either were not putting money away or that ran into unexpected circumstances that set them back in their saving, there are options for rebounding and still ensuring that repairs are made. That said, some may be more palatable than others to residents. If the money is not there to do the renovations, there are basically three choices. “Borrow the money, delay repairs—which is not a good idea— or assess the shareholders,” says Roude.

Assessments are never a popular idea, which means borrowing quickly jumps to the top of the options list. “A lot of co-ops have refinanced mortgages and taken out extra money in anticipation of work that will need to be done so they have that reserve,” Roude says. Some buildings had high-rate mortgages so when they refinanced, they kept their payments the same but took out extra cash. “The cash flow stays the same, but now they have a reserve,” says Roude.

Other communities may turn to lines of credit to supplement their reserves. Roude recalls a co-op building that refinanced two years ago and took out money for repairs as well as a line of credit. After doing their reserve study, they realized they still did not have enough, so they doubled the line of credit and issued an assessment. Because they borrowed for the roof work that needed to be done, though, they were able to assess the shareholders over three years and not bombard them with one overwhelming amount. “It will cost us some interest over the years” but it solved the problem, Roude says. And for the residents and the assessment, “at least it’s not hitting them all at once. They can ease into it over three years and adjust their cash flow. In the meantime, the building gets to do the work now.”

Making sure there will be enough money on hand when the rainy day comes is of paramount importance for boards, managers and residents.

“The board should constantly be reviewing the funds with their managing agents or accountants so they’re not caught by surprise when these repairs come up,” says Roude. Especially with buildings getting older, certain repairs have to be made, he says.

For boards who find themselves behind in their savings efforts, it is never too late to start. “It’s different for every association but there are different ways to get to where you need to be,” says Frumkin. “If you’re underfunded, you can change how much you’re putting aside.” And boards and managers also can enlist the talents of industry experts who have experience in reserve studies and solid, prudent planning. “There are ways to get there if you work with someone who understands the different types of plans.”

As difficult as it may be to set aside extra funds or as intimidating as it may be to inform a building’s residents that cash must be raised and saved, these alternatives still come out way ahead of finding out too late that there is no cash, no resources and few options for replacing a leaky roof during a rainy spring or a broken-down boiler in the dead of winter.

As with everything in life, thinking ahead can help alleviate stress and put management in the driver’s seat for a safe, well-funded and well-planned future—an approach every resident certainly can endorse.     

Liz Lent is a freelance writer and a regular contributor to The New Jersey Cooperator. Freelance writer Christy Smith-Sloman contributed to this article.

Related Articles

3D illustration of a rubber stamp with the word refinance over a mortgage lender rate sheet. Debt consolidation and debt or loan refinancing concept.

The Uncertainties of Refinancing Your Underlying Mortgage

Today’s Interest Market Poses Challenges

Washington DC, USA - July 3, 2017: Federal Trade Commission and Housing Finance Agency seals in downtown with closeup of sign and logo

Is Your Condo on Fannie Mae’s Blacklist?

Listed Communities Face Big Problems Borrowing

Clipboard icon set. Checklist on the clipboard line icon with checkmarks, checklist, document, gear, pencil. Checklist symbol. Editable stroke. Isolated.

Best Practices for Community Maintenance, from Structural to Financial

New Report Spells it All Out

Miami Beach Surfside, FL, USA - June 26, 2021: Champlain Towers remains 2 days after collapse owners personal belongings visible hanging from the units

New Law Sets Reserve Requirements for NJ Communities:

An Interview With Attorney Michael S. Simone

house model like up arrow on background, finance and banking about house concept, investment ideas about real estate.house loan, housing price.

NHC President Warns of Stagflation After Fed's Latest Rate Increase

Raising Interest 'Is No Longer the Answer'

Tapping Reserves in a Time of Financial Crisis

Tapping Reserves in a Time of Financial Crisis

An Option to (Carefully!) Consider